How many coats should the bid include?expand_more
Two finish coats over primed surfaces is the standard worth paying for, and the bid should say so explicitly. One coat over a similar color can look fine initially, but film thickness is what gives paint its life expectancy in a climate this wet.
How long does exterior paint last here?expand_more
With solid prep and quality product, commonly eight to twelve years on the sheltered sides, less on the south face taking summer sun and on any elevation catching wind-driven rain. Trim and horizontal surfaces typically fail first, and touching those up on schedule buys years.
Do I need to be home during the work?expand_more
Not for exteriors, beyond arranging access to power and water and unlocking gates. For interiors most homeowners prefer to be around for color checks on the first wall. Discuss pets, since gates left open is a common complaint.
Who moves the furniture and covers the floors?expand_more
Get it in writing. Most interior bids include moving furniture to the center and masking floors, but some assume the room is empty when they arrive. It's a real cost difference and a common source of first-day friction.
Is spraying better than brushing and rolling?expand_more
Spraying is faster and lays a smoother film, but it needs serious masking and works best back-rolled on porous surfaces. Most quality crews here spray and back-roll exteriors. What matters more than the method is whether the prep underneath was done properly.
What should be included in the painter's cleanup?expand_more
The written scope should cover masking removal, paint-chip collection, fixtures and glass cleanup, daily material storage, final touchups, and disposal. Ask for labeled leftover paint for future repairs and confirm that windows, doors, gates, and exterior hardware work normally at the walkthrough.
How do I compare paint products in two bids?expand_more
Ask for the manufacturer, product line, sheen, primer, and number of finish coats by surface. Brand alone is not enough because each manufacturer sells several quality tiers. Confirm that the chosen system is compatible with the existing coating and the siding material.
When should the final payment be due?expand_more
Use the written schedule and reserve final payment until the agreed surfaces, repairs, touchups, cleanup, and walkthrough are complete. Product curing may continue afterward, but visible scope completion and protection issues can be confirmed before the balance is released.