Does concrete work in Camas need a permit?expand_more
Requirements depend on structural use, grading, retaining height, right-of-way work and the parcel. Confirm the complete scope with the City of Camas before work.
What should be checked before concrete arrives?expand_more
Verify dimensions, elevations, stable base, forms, reinforcement support, sleeves, drainage, weather plan and any required inspection.
Can a settled slab be repaired instead of replaced?expand_more
Sometimes, but the decision should follow measured displacement, support, drainage, load and condition rather than the crack alone.
How should hidden unsuitable soil be priced?expand_more
Use a defined investigation, unit rate or written approval threshold with photographs and measured quantities before correction proceeds.
What belongs in concrete closeout?expand_more
Keep pre-placement photographs, permits, inspection records, material information, cure instructions, measured drainage checks and warranty.
How do I verify a Camas contractor?expand_more
Match the legal business, registration, bond and insurance on the proposal to Washington L&I Verify records.
How should drainage be documented in the bid?expand_more
Record existing and proposed elevations, slope direction, roof discharge, low points and a lawful outlet. Identify who adjusts adjoining walks, soil, drains or landscaping. Require a final water-flow or measured-slope check rather than relying on appearance alone.
What should a concrete change order show?expand_more
Photograph the unexpected soil, buried material, access condition or damaged assembly and state the measured quantity, revised method, price and schedule effect. Except immediate safety measures, approval should occur before extra excavation, reinforcement or restoration is concealed.